Difference between revisions of "Minutes-6-24-2010"
From GlueXWiki
Line 18: | Line 18: | ||
<!-- | <!-- | ||
= Minutes = | = Minutes = | ||
− | Participants: | + | Participants: Bill, Glenn, Casey, Roger, Mark, Fernando, Beni, Simon, and Lubomir. |
== Production == | == Production == | ||
+ | - Bill: the PR for the clean room is in place but not for the ACs. We will need the AC, the one for the whole bay area, to start moving there some stuff that doesn't require clean environment. Teresa Danforth is the person to be contacted and Glenn will help us in that. | ||
+ | |||
+ | - Bill: the cathode production plan is in a good shape: Fast Track procedure will be posted soon. The wire stringing planing will require more information since we have not done the stringing. Therefore, first we need to start setting up the fixtures from UVA and exercising and then clarify the procedure. | ||
- The PR for the clean room was submitted at the end of last week. The specifications and estimate are linked above. The estimate is for $250K for the clean room, including the electrical installations, excluding the AC. According to the schedule, the installation must be completed and the room commissioned on Sep. 13 this year. The CC will take care of the network, including wireless. We will buy a color laser printer/copier/scanner for ~$700, i.e. low quality. | - The PR for the clean room was submitted at the end of last week. The specifications and estimate are linked above. The estimate is for $250K for the clean room, including the electrical installations, excluding the AC. According to the schedule, the installation must be completed and the room commissioned on Sep. 13 this year. The CC will take care of the network, including wireless. We will buy a color laser printer/copier/scanner for ~$700, i.e. low quality. | ||
Revision as of 12:57, 25 June 2010
June 24, 2010 FDC meeting
Tentative Agenda
- Production
- 727 B.C. status
- production planning
- plans for wire stringing in 126 pin rail, pos meas cam, pos meas , pos meas parts, pretension screw, string table
- Electronics
- fADC125 status (Gerard, Fernando)
- ground modifications
- Cathode redesign: finalizing (Roger, Bill)
- Full-scale prototype tests
- tests with fADC FDC Log Book, pages 494 - 500 (Lubomir)
- cosmic tests (Beni)
- Other