- Dave (see the Construction Tracking link above): cell#2 is ready, including one end window. Anatoly cleaned the wire frame manually. Second end window will be ready tomorrow. Will start very soon stacking the package, but need some parts. Cell#3: position measurements on the wire frame (Caleb and Al made a code that does it automatically, but has not been tested yet), making flaps on one of the cathodes and gluing rigid-flexes on the other one. Cell#4: wire frame is ready for stringing, one of the cathoed is being tensioned and the foil for the second is in preparation.     
 
- Dave (see the Construction Tracking link above): cell#2 is ready, including one end window. Anatoly cleaned the wire frame manually. Second end window will be ready tomorrow. Will start very soon stacking the package, but need some parts. Cell#3: position measurements on the wire frame (Caleb and Al made a code that does it automatically, but has not been tested yet), making flaps on one of the cathodes and gluing rigid-flexes on the other one. Cell#4: wire frame is ready for stringing, one of the cathoed is being tensioned and the foil for the second is in preparation.     
  
- We discussed if we can relax the clean room humidity requirements to save on the energy bill. The main concern are the gluing operation and the Rohacell material being  
+
- We discussed if we can relax the clean room humidity requirements to save on the energy bill. The main concerns are the gluing operations and the Rohacell material being susceptible to elevated humidity. Tim explained: there's no humidity control and therefore it depends on the heat in the room (that's why it was elevated over the last weekend); we could increase the setting temperature from 69 to 70deg F to see the effect. Eugene: first we have to establish the production and then to investigate the effect of the humidity, even 50% is very high. Conclusion: at least for this month we don't want to change the settings.
 +
 
  
 
== Engineering ==
 
== Engineering ==

Revision as of 17:32, 23 June 2011

June 23, 2011 FDC meeting

Agenda

  1. Production Construction Tracking (Dave)
    • Second and third cell status
    • Humidity requirements (related to possible changes of the AC settings)
    • Other: using radioactive source at Blue Crab
  2. Engineering (Bill)
    • Wire deadening Sasha's doc (page 13, Fig.14)
    • Package cabling
    • Other
  3. Electronics update (Fernando, Chris)
  4. Chamber testing at EEL126 (Beni, Lubomir)
    • First cell status
    • DAQ and software
  5. Other