Difference between revisions of "Minutes-6-23-2011"
From GlueXWiki
Line 21: | Line 21: | ||
= Minutes = | = Minutes = | ||
− | Participants: Eugene, Bill, | + | Participants: Eugene, Bill, Tim, Dave, Chris, Mark, Beni, Simon, Casey, and Lubomir. |
− | + | ||
− | + | ||
− | + | ||
− | + | ||
== Production == | == Production == |
Revision as of 16:56, 23 June 2011
June 23, 2011 FDC meeting
Agenda
- Production Construction Tracking (Dave)
- Second and third cell status
- Humidity requirements (related to possible changes of the AC settings)
- Other: using radioactive source at Blue Crab
- Engineering (Bill)
- Wire deadening Sasha's doc (page 13, Fig.14)
- Package cabling
- Other
- Electronics update (Fernando, Chris)
- Chamber testing at EEL126 (Beni, Lubomir)
- First cell status
- DAQ and software
- Other