Difference between revisions of "Minutes-6-23-2011"

From GlueXWiki
Jump to: navigation, search
Line 21: Line 21:
 
= Minutes =
 
= Minutes =
  
Participants: Eugene, Bill, Glenn, Dave, Chris, Beni, Simon, and Lubomir.
+
Participants: Eugene, Bill, Tim, Dave, Chris, Mark, Beni, Simon, Casey, and Lubomir.
+
== Other ==
+
 
+
At the beginning of the meeting Bill and Dave, representing also other non-physicists, expressed interest in learning more about drift chambers, GlueX detectors and physics and beyond. Eugene, Simon, Beni were happy to answer their questions. We all agreed also to organize a special presentation for them.  
+
  
 
== Production ==
 
== Production ==

Revision as of 16:56, 23 June 2011

June 23, 2011 FDC meeting

Agenda

  1. Production Construction Tracking (Dave)
    • Second and third cell status
    • Humidity requirements (related to possible changes of the AC settings)
    • Other: using radioactive source at Blue Crab
  2. Engineering (Bill)
    • Wire deadening Sasha's doc (page 13, Fig.14)
    • Package cabling
    • Other
  3. Electronics update (Fernando, Chris)
  4. Chamber testing at EEL126 (Beni, Lubomir)
    • First cell status
    • DAQ and software
  5. Other