Difference between revisions of "Minutes-6-23-2011"

From GlueXWiki
Jump to: navigation, search
(Agenda)
Line 8: Line 8:
 
#* Other: using radioactive source at Blue Crab
 
#* Other: using radioactive source at Blue Crab
 
# Engineering (Bill)
 
# Engineering (Bill)
#* Wire deadening
+
#* Wire deadening [http://argus.phys.uregina.ca/gluex/DocDB/0014/001471/001/rate_bfield.pdf Sasha's doc] (page 13, Fig.14)
 
#* Package cabling
 
#* Package cabling
 
#* Other
 
#* Other

Revision as of 11:10, 23 June 2011

June 23, 2011 FDC meeting

Agenda

  1. Production Construction Tracking (Dave)
    • Second and third cell status
    • Humidity requirements (related to possible changes of the AC settings)
    • Other: using radioactive source at Blue Crab
  2. Engineering (Bill)
    • Wire deadening Sasha's doc (page 13, Fig.14)
    • Package cabling
    • Other
  3. Electronics update (Fernando, Chris)
  4. Chamber testing at EEL126 (Beni, Lubomir)
    • First cell status
    • DAQ and software
  5. Other