Difference between revisions of "Minutes-6-23-2011"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 5: Line 5:
 
# Production [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Construction_Tracking.xlsx Construction Tracking] (Dave)
 
# Production [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Construction_Tracking.xlsx Construction Tracking] (Dave)
 
#* Second and third cell status
 
#* Second and third cell status
#* Humidity requirements (related to possible changes in the AC settings)
+
#* Humidity requirements (related to possible changes of the AC settings)
 
#* Other: using radioactive source at Blue Crab
 
#* Other: using radioactive source at Blue Crab
 
# Engineering (Bill)
 
# Engineering (Bill)

Revision as of 15:56, 22 June 2011

June 23, 2011 FDC meeting

Agenda

  1. Production Construction Tracking (Dave)
    • Second and third cell status
    • Humidity requirements (related to possible changes of the AC settings)
    • Other: using radioactive source at Blue Crab
  2. Engineering (Bill)
    • Wire deadening
    • Package cabling
    • Other
  3. Electronics update (Fernando, Chris)
  4. Chamber testing at EEL126 (Beni, Lubomir)
    • First cell status
    • DAQ and software
  5. Other