Difference between revisions of "Minutes-5-8-2014"

From GlueXWiki
Jump to: navigation, search
(Created page with "May 1, 2014 FDC+CDC meeting = Agenda = # Gas system status [http://www.jlab.org/Hall-D/detector/fdc/gas_system/GAS_SYSTEM_PI_DIAGRAM_PRELIM.pdf],[http://www.jlab.org/Hall-D/dete...")
 
Line 7: Line 7:
 
# Engineering (Bill)
 
# Engineering (Bill)
 
# Electronics (Chris, Nick)
 
# Electronics (Chris, Nick)
# FDC alignment (Lubomir)
+
# FDC alignment [http://www.jlab.org/Hall-D/detector/fdc/calibration/Cdx_all.pdf], [http://www.jlab.org/Hall-D/detector/fdc/calibration/t2d_new.pdf], [http://www.jlab.org/Hall-D/detector/fdc/calibration/Cdy_all.pdf],[http://www.jlab.org/Hall-D/detector/fdc/calibration/Cdx_cell6.pdf], [http://www.jlab.org/Hall-D/detector/fdc/calibration/Cdx_cell1.pdf](Lubomir)
 
# Other
 
# Other
  

Revision as of 22:27, 7 May 2014

May 1, 2014 FDC+CDC meeting

Agenda

  1. Gas system status [1],[2] (Dave)
  2. DAQ (Beni)
  3. CDC testing (Mike)
  4. Engineering (Bill)
  5. Electronics (Chris, Nick)
  6. FDC alignment [3], [4], [5],[6], [7](Lubomir)
  7. Other

Instructions for Bluejeans meeting connection

FDC meeting ID: 290664653