Difference between revisions of "Minutes-5-5-2011"
From GlueXWiki
Line 5: | Line 5: | ||
# Production | # Production | ||
#* Status (Dave) | #* Status (Dave) | ||
− | #* Wire position scanning (Lubomir) | + | #* Wire position scanning [http://www.jlab.org/htbin/PHYSICS/halld/enote112.pl?nb=notebook&action=view&page=564 logbook page 564] (Lubomir) |
#* End window material (Bill) | #* End window material (Bill) | ||
# Electronics (Fernando, Chris) | # Electronics (Fernando, Chris) |
Revision as of 11:52, 5 May 2011
May 5, 2011 FDC meeting
Agenda
- Production
- Status (Dave)
- Wire position scanning logbook page 564 (Lubomir)
- End window material (Bill)
- Electronics (Fernando, Chris)
- Status
- Rigid-flex stuffing
- Engineering status (Bill)
- Chamber testing (Beni)
- Equipment needed for Blue Crab
- Pressure measurements
- Other