Difference between revisions of "Minutes-5-5-2011"
From GlueXWiki
Line 3: | Line 3: | ||
= Agenda = | = Agenda = | ||
− | # Production | + | # Production |
− | #* Status | + | #* Status (Dave) |
− | #* Wire position scanning | + | #* Wire position scanning (Lubomir) |
− | # | + | #* End window material (Bill) |
− | # | + | # Electronics (Fernando, Chris) |
+ | #* Status | ||
+ | #* Rigid-flex stuffing | ||
# Engineering status (Bill) | # Engineering status (Bill) | ||
# Chamber testing | # Chamber testing | ||
− | #* | + | #* Pressure measurements (Beni) |
− | # Other | + | # Other |
<!-- | <!-- |
Revision as of 23:39, 4 May 2011
May 5, 2011 FDC meeting
Agenda
- Production
- Status (Dave)
- Wire position scanning (Lubomir)
- End window material (Bill)
- Electronics (Fernando, Chris)
- Status
- Rigid-flex stuffing
- Engineering status (Bill)
- Chamber testing
- Pressure measurements (Beni)
- Other