Difference between revisions of "Minutes-5-5-2011"

From GlueXWiki
Jump to: navigation, search
 
Line 3: Line 3:
 
= Agenda =
 
= Agenda =
  
# Production (Dave)
+
# Production
#* Status
+
#* Status (Dave)
#* Wire position scanning
+
#* Wire position scanning (Lubomir)
# Electronics
+
#* End window material (Bill)
#* Status (Fernando,Chris)
+
# Electronics (Fernando, Chris)  
 +
#* Status
 +
#* Rigid-flex stuffing
 
# Engineering status (Bill)
 
# Engineering status (Bill)
 
# Chamber testing
 
# Chamber testing
#* Calibration and resolution studies (Simon) [http://www.jlab.org/htbin/PHYSICS/halld/enote112.pl?nb=notebook&action=view&page=557 logbook page 557]
+
#* Pressure measurements (Beni)
# Other: talks at the collaboration meeting
+
# Other
  
 
<!--
 
<!--

Revision as of 23:39, 4 May 2011

May 5, 2011 FDC meeting

Agenda

  1. Production
    • Status (Dave)
    • Wire position scanning (Lubomir)
    • End window material (Bill)
  2. Electronics (Fernando, Chris)
    • Status
    • Rigid-flex stuffing
  3. Engineering status (Bill)
  4. Chamber testing
    • Pressure measurements (Beni)
  5. Other