Difference between revisions of "Minutes-5-3-2012"
From GlueXWiki
Line 2: | Line 2: | ||
= Agenda = | = Agenda = | ||
− | # Production [http://www.jlab.org/Hall-D/detector/fdc/production/ | + | # Production [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Construction_May_3_2012.xlsx Construction Tracking] (Dave) |
#* Production status | #* Production status | ||
#* Third package refurbishment status | #* Third package refurbishment status |
Revision as of 12:11, 3 May 2012
May 3, 2012 FDC meeting
Agenda
- Production Construction Tracking (Dave)
- Production status
- Third package refurbishment status
- Third package tests (Lubomir)
- Engineering update (Bill)
- Electronics update (Chris)
- Tests with first package at 126 FDC E-log (Beni)
- Other