Difference between revisions of "Minutes-5-22-2014"

From GlueXWiki
Jump to: navigation, search
Line 7: Line 7:
 
# Engineering (Bill)
 
# Engineering (Bill)
 
# Electronics (Chris, Nick)
 
# Electronics (Chris, Nick)
# FDC alignment [http://www.jlab.org/Hall-D/detector/fdc/calibration/FDCresolution.pdf](Lubomir)
+
# FDC alignment [http://www.jlab.org/Hall-D/detector/fdc/calibration/FDCresolution.pdf],[http://www.jlab.org/Hall-D/detector/fdc/calibration/Cdx_cell6.pdf](Lubomir)
 
# Other
 
# Other
  

Revision as of 12:19, 22 May 2014

May 22, 2014 FDC+CDC meeting

Agenda

  1. Gas system status
  2. DAQ (Beni)
  3. CDC testing (Mike)
  4. Engineering (Bill)
  5. Electronics (Chris, Nick)
  6. FDC alignment [1],[2](Lubomir)
  7. Other

Instructions for Bluejeans meeting connection

FDC meeting ID: 290664653