Difference between revisions of "Minutes-4-8-2010"
From GlueXWiki
Line 8: | Line 8: | ||
#* requirements, floor plan | #* requirements, floor plan | ||
# Electronics (Fernando) | # Electronics (Fernando) | ||
− | #* finalizing PCB design | + | #* finalizing PCB design [http://www.jlab.org/Hall-D/detector/fdc/electronics/HVright.pdf HV_right] [http://www.jlab.org/Hall-D/detector/fdc/electronics/HVleft.pdf HV_left] |
#* cable procurement | #* cable procurement | ||
# Cathode redesign [http://www.jlab.org/Hall-D/detector/fdc/drawings/cathode_foil_redesign.pdf redesign], [http://www.jlab.org/Hall-D/detector/fdc/drawings/central_hole_redesign.pdf central hole] (Bill, Roger) | # Cathode redesign [http://www.jlab.org/Hall-D/detector/fdc/drawings/cathode_foil_redesign.pdf redesign], [http://www.jlab.org/Hall-D/detector/fdc/drawings/central_hole_redesign.pdf central hole] (Bill, Roger) | ||
# Redesigned frame prototype | # Redesigned frame prototype | ||
− | #* plans for tests | + | #* plans for tests |
# Full scale prototype (Beni) | # Full scale prototype (Beni) | ||
#* two-layer HV tests | #* two-layer HV tests |
Revision as of 10:31, 8 April 2010
April 8, 2010 FDC meeting
Tentative Agenda
- Off-site production space
- status
- requirements, floor plan
- Electronics (Fernando)
- Cathode redesign redesign, central hole (Bill, Roger)
- Redesigned frame prototype
- plans for tests
- Full scale prototype (Beni)
- two-layer HV tests
- third layer status
- preparation for cosmics tests
- Other