Minutes-4-7-2011
From GlueXWiki
April 7, 2011 FDC meeting
Agenda
- Production
- Readiness review: preliminary results (Lubomir)
- Production status (Dave)
- Electronics
- Status (Fernando,Chris)
- Cathode foil inspection
- Engineering
- Tests with conductive tape (Lubomir, Bill)
- Status (Bill)
- Chamber testing
- Electronics calibration (Simon)
- Other