Difference between revisions of "Minutes-4-5-2012"
From GlueXWiki
Line 39: | Line 39: | ||
== Engineering == | == Engineering == | ||
− | - Bill is finalizing the fiducial scheme | + | - Bill is finalizing the fiducial scheme: will have 4 fiducial holders on each package visible at all times. Difficulties finding non-magnetic low-mass materials. Eugene and Beni had different suggestions especially concerning the z-position determination. Bill will coordinate his plan with the survey group. Bill is working also on the spacer between the packages, decided to have 3 supporting rods instead of 4, |
== Electronics == | == Electronics == | ||
− | + | - Chris: there's a plan | |
− | + | ||
− | - Chris: | + | |
---> | ---> |
Revision as of 15:41, 6 April 2012
April 5, 2012 FDC meeting
Agenda
- Production Construction Tracking (Dave)
- New procedures for the O-ring replacements
- Production status
- Results from the oxygen studies (Lubomir)
- Engineering update (Bill)
- Electronics update (Chris)
- Possibilities for cluster counting (Lubomir)
- Other