Difference between revisions of "Minutes-4-5-2012"

From GlueXWiki
Jump to: navigation, search
Line 6: Line 6:
 
#* New procedures for the O-ring replacements  
 
#* New procedures for the O-ring replacements  
 
#* Production status
 
#* Production status
# Results from the [http://www.jlab.org/Hall-D/detector/fdc/document/oxygen.pdf oxygen studies] (Lubomir)
+
# Results from the [http://www.jlab.org/Hall-D/detector/fdc/documents/oxygen.pdf oxygen studies] (Lubomir)
 
# Engineering update (Bill)  
 
# Engineering update (Bill)  
 
# Electronics update (Chris)
 
# Electronics update (Chris)

Revision as of 18:27, 4 April 2012

April 5, 2012 FDC meeting

Agenda

  1. Production Construction Tracking (Dave)
    • New procedures for the O-ring replacements
    • Production status
  2. Results from the oxygen studies (Lubomir)
  3. Engineering update (Bill)
  4. Electronics update (Chris)
  5. Possibilities for cluster counting (Lubomir)
  6. Other