Difference between revisions of "Minutes-4-28-2011"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 8: | Line 8: | ||
# Electronics | # Electronics | ||
#* Status (Fernando,Chris) | #* Status (Fernando,Chris) | ||
− | #* Preamp settings: gain, dynamic range (Fernando, Beni) [http://www.jlab.org/Hall-D/detector/fdclog/ logbook] | + | #* Preamp settings: gain, dynamic range (Fernando, Beni) [http://www.jlab.org/Hall-D/detector/fdclog/ logbook] and [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1364 GlueX-Doc 1364: Test of GlueX preamplifier] |
# Engineering status (Bill) | # Engineering status (Bill) | ||
# Chamber testing | # Chamber testing |
Revision as of 09:40, 28 April 2011
April 28, 2011 FDC meeting
Agenda
- Production (Dave)
- Status
- Lessons learned from the first weeks of production
- Electronics
- Status (Fernando,Chris)
- Preamp settings: gain, dynamic range (Fernando, Beni) logbook and GlueX-Doc 1364: Test of GlueX preamplifier
- Engineering status (Bill)
- Chamber testing
- Calibration and resolution studies (Simon)
- Other: talks at the collaboration meeting