Minutes-4-25-2013

From GlueXWiki
Revision as of 12:33, 19 April 2013 by Pentchev (Talk | contribs)

Jump to: navigation, search

April 25, 2013 FDC meeting

Agenda

  1. Production Construction Tracking (Dave)
    • Third package status
    • Spare package
  2. Corrosion tests at MePhi: results, [1], [2], [3], [4], [5], [6], [7]
  3. Installation (Lubomir, Bill)
    • FDC installation document
    • Practicing at Blue Crab
  4. Engineering (Bill)
    • Cooling system tests
  5. Electronics (Chris, Nick)
  6. Full electronics tests FDC E-log
  7. Other