Difference between revisions of "Minutes-4-25-2013"

From GlueXWiki
Jump to: navigation, search
Line 11: Line 11:
 
#* Practicing at Blue Crab  
 
#* Practicing at Blue Crab  
 
# Engineering (Bill)
 
# Engineering (Bill)
#* Cooling system tests
+
#* Cooling system tests [http://www.jlab.org/Hall-D/detector/fdc/photographs/IMG_0395.jpg], [http://www.jlab.org/Hall-D/detector/fdc/photographs/IMG_0397.jpg], [http://www.jlab.org/Hall-D/detector/fdc/photographs/IMG_0400.jpg]
 
# Electronics (Chris, Nick)
 
# Electronics (Chris, Nick)
 
# Full electronics tests [https://halldweb1.jlab.org/elog-halld/FDC FDC E-log] (Beni)
 
# Full electronics tests [https://halldweb1.jlab.org/elog-halld/FDC FDC E-log] (Beni)

Revision as of 15:36, 25 April 2013

April 25, 2013 FDC meeting

Agenda

  1. Production Construction Tracking (Dave)
    • Third package status
    • Spare package
  2. Corrosion tests at MePhi: results, [1], [2], [3], [4], [5], [6], [7]
    • Discoloration in the bottom cathode of package #3 [8], [9], [10], [11]
  3. Installation (Lubomir, Bill)
    • FDC installation document
    • Practicing at Blue Crab
  4. Engineering (Bill)
  5. Electronics (Chris, Nick)
  6. Full electronics tests FDC E-log (Beni)
  7. Other