Minutes-4-18-2013
From GlueXWiki
Revision as of 17:54, 17 April 2013 by Pentchev (Talk | contribs) (Created page with "April 18, 2013 FDC meeting = Agenda = # Production [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Construction_April_11_2013.xlsx Construction Tracking] (Dave) #* Packa...")
April 18, 2013 FDC meeting
Agenda
- Production Construction Tracking (Dave)
- Package #3 status
- Installation (Lubomir, Bill)
- FDC installation document
- Plans for practicing at Blue Crab
- Engineering (Bill)
- Cooling system tests
- Electronics (Chris, Nick)
- Tests at EEL126 FDC E-log
- Other