Difference between revisions of "Minutes-3-7-2013"

From GlueXWiki
Jump to: navigation, search
(Production)
Line 20: Line 20:
 
== Production ==
 
== Production ==
  
- Dave: one more cathode with the daughter cards installed. Chris and Nick finished the HV cabling/connectors for the last package (#2). The PR for Vision Machine (for the gas blocks and thick spacers) went through, Adam already contacted Bill with this respect.   
+
- Dave: one more cathode with the daughter cards installed. Chris and Nick finished the HV cabling/connectors for the last package (#2). The package is ready for testing, just have to install it on the strong-back and also drill holes in the end-window to attach the HV cables at the bottom. The PR for Vision Machine (for the gas blocks and thick spacers) went through, Adam already contacted Bill with this respect.   
  
- We are planning to fix the HV problem in package #3 starting next week when the mounting table will be available. The problematic HV sector (#2, 20 wires) is in plane 6 (not 5! as in the previous minutes), so it will be easier since we will open it from the back of the package. Bill agrees this is doable.  
+
- We are planning to fix the HV problem in package #3 starting next week when the mounting table will be available. The problematic HV sector (#2, 20 wires) is in plane 6 (not 5! as in the previous minutes), so it will be easier since we will open it from the back of the package. Bill agrees this is doable.
  
 
== Rebaselining update ==
 
== Rebaselining update ==

Revision as of 16:33, 7 March 2013

March 7, 2013 FDC meeting

Agenda

  1. Production Construction Tracking (Dave)
    • Spare parts
    • Package #2 status
    • Package #3 repair
  2. Rebaselining update [1](Lubomir)
  3. Installation schedule (Lubomir)
  4. Engineering (Bill)
    • Manifold installation
  5. Electronics (Chris, Nick)
  6. Tests at EEL126 FDC E-log (Beni)
  7. Other

Minutes

Participants: Bill, Dave, Chris, Nick, Simon, Beni, and Lubomir.

Production

- Dave: one more cathode with the daughter cards installed. Chris and Nick finished the HV cabling/connectors for the last package (#2). The package is ready for testing, just have to install it on the strong-back and also drill holes in the end-window to attach the HV cables at the bottom. The PR for Vision Machine (for the gas blocks and thick spacers) went through, Adam already contacted Bill with this respect.

- We are planning to fix the HV problem in package #3 starting next week when the mounting table will be available. The problematic HV sector (#2, 20 wires) is in plane 6 (not 5! as in the previous minutes), so it will be easier since we will open it from the back of the package. Bill agrees this is doable.

Rebaselining update

- For all of the FDC activities there are links in the above html file, explaining the scope, resources and bases for estimates. Within these links for some of the items there are additional links to documents used for these estimations. There are some items we were not sure about like: 25211210 (materials for cooling), 25211215 (materials for alignment/fiducials), 25211216 (materials for HV connectors). Bill thinks all the materials for the first two have been ordered. As for the HV connectors, we have all the connectors that we need for the FDC (Nick).

Installation