Difference between revisions of "Minutes-3-21-2013"

From GlueXWiki
Jump to: navigation, search
Line 15: Line 15:
 
= Minutes =
 
= Minutes =
  
Participants: Bill, Chris, Nick, Simon, Beni, and Lubomir.
+
Participants: Fernando, Eugene, Bill, Dave, Chris, Nick, Simon, Beni, and Lubomir.
  
 
== Production ==
 
== Production ==
  
- Dave (not at the meeting) prepared the Production Tracking: all cathodes for the spare package are ready. We will built also one extra cathode that is tensioned now. Wire planes: Chris is coming tomorrow to Blue Crab to finish with the population of the last two wire planes. Then it will remain four wire planes (one will be extra spare) to be deadened and we are done with the spare parts.     
+
- Dave: the last two wire frames populated. The only remaining operation is to deaden three wire planes. The extra spare cathode type-2 is tensioned, but the cards are not installed by purpose     
  
 
- On Friday package #1 was moved from 126 to Blue Crab and then package #2 - from Blue Crab to 126. After connecting #1 to Nitrogen it was found cell #5 is leaking; turned out the barb connector for the guage tube was loosely connected. These connectors are glued initially with super glue, but later on some of them (and not on this one) green epoxy was added. Casey was able to glue a new barb connector (not easy to reach the spacer ring  since you have only 5mm between the cathode and the wire frame) and fixed the problem. Then green epoxy was added on all the connectors of packages #1 and #4 that didn't have it before (5 out of 12). Bill wants to try with Casey using shoe glue that better sticks to polyethylene.  
 
- On Friday package #1 was moved from 126 to Blue Crab and then package #2 - from Blue Crab to 126. After connecting #1 to Nitrogen it was found cell #5 is leaking; turned out the barb connector for the guage tube was loosely connected. These connectors are glued initially with super glue, but later on some of them (and not on this one) green epoxy was added. Casey was able to glue a new barb connector (not easy to reach the spacer ring  since you have only 5mm between the cathode and the wire frame) and fixed the problem. Then green epoxy was added on all the connectors of packages #1 and #4 that didn't have it before (5 out of 12). Bill wants to try with Casey using shoe glue that better sticks to polyethylene.  

Revision as of 15:39, 21 March 2013

March 21, 2013 FDC meeting

Agenda

  1. Production Construction Tracking (Dave)
    • Package #3 repair
  2. Installation schedule(Lubomir)
  3. Engineering (Bill)
    • Cooling manifold installation and tests
  4. Electronics (Chris, Nick)
  5. Tests at EEL126 FDC E-log (Beni)
  6. Other