Difference between revisions of "Minutes-3-20-2014"

From GlueXWiki
Jump to: navigation, search
Line 2: Line 2:
  
 
= Agenda =
 
= Agenda =
# Final installation and testing [http://www.jlab.org/Hall-D/detector/fdc/installation/Final_install_1.JPG]
+
# Final installation and testing [http://www.jlab.org/Hall-D/detector/fdc/installation/Final_install_1.JPG], [http://www.jlab.org/Hall-D/detector/fdc/installation/Final_install_2.JPG]
 
## [http://www.jlab.org/Hall-D/detector/fdc/installation/Test_at_connectors_partial_Jan_Feb_2014.xlsx Testing with scope] (Lubomir)
 
## [http://www.jlab.org/Hall-D/detector/fdc/installation/Test_at_connectors_partial_Jan_Feb_2014.xlsx Testing with scope] (Lubomir)
 
## Testing with DAQ [https://halldweb1.jlab.org/elog-halld/FDC E-log] (Beni)  
 
## Testing with DAQ [https://halldweb1.jlab.org/elog-halld/FDC E-log] (Beni)  

Revision as of 16:54, 19 March 2014

March 20, 2014 FDC meeting

Agenda

  1. Final installation and testing [1], [2]
    1. Testing with scope (Lubomir)
    2. Testing with DAQ E-log (Beni)
  2. Engineering (Bill, Dave)
    1. Cathode scan
    2. Fixing tools inside magnet
  3. Electronics (Chris, Nick)
  4. Other