Difference between revisions of "Minutes-3-18-2010"
From GlueXWiki
(→Tentative Agenda) |
|||
Line 7: | Line 7: | ||
#* production space update | #* production space update | ||
#* FDC procurement plans | #* FDC procurement plans | ||
+ | #** procurement of cables, connectors (HV, signal, LV) | ||
+ | #** procurement of cathodes: flex connection, beam hole size [http://www.jlab.org/Hall-D/detector/fdc/new_reports/ wire sample reports] | ||
# Full scale prototype tests | # Full scale prototype tests | ||
#* prototype test updates | #* prototype test updates | ||
Line 14: | Line 16: | ||
# Wire frame update | # Wire frame update | ||
#* PCB status | #* PCB status | ||
− | #* wire sample measurements [http://www.jlab.org/Hall-D/detector/fdc/new_reports/ | + | #* wire sample measurements [http://www.jlab.org/Hall-D/detector/fdc/new_reports/ tracking meeting] |
# Cathode frame redesign | # Cathode frame redesign | ||
#* cathode redesign status | #* cathode redesign status |
Revision as of 18:34, 17 March 2010
March 18, 2010 FDC meeting
Tentative Agenda
- FDC production
- production space update
- FDC procurement plans
- procurement of cables, connectors (HV, signal, LV)
- procurement of cathodes: flex connection, beam hole size wire sample reports
- Full scale prototype tests
- prototype test updates
- HV tests
- frame modification work: cathode sandwich and wire frame
- plans for layer 3
- Wire frame update
- PCB status
- wire sample measurements tracking meeting
- Cathode frame redesign
- cathode redesign status
- rigid-flex assembly
- Wire winding
- IUCF phase 3 contract
- plans for wire winding upgrades
- tension specs
- Other
- FDC naming convention
- ...