Line 14: Line 14:
 
# Wire frame update
 
# Wire frame update
 
#* PCB status
 
#* PCB status
#* wire sample measurements
+
#* wire sample measurements [http://www.jlab.org/Hall-D/detector/fdc/new_reports/ wire sample reports]
 
# Cathode frame redesign
 
# Cathode frame redesign
 
#* cathode redesign status
 
#* cathode redesign status
Line 63: Line 63:
 
==Construction Updates==
 
==Construction Updates==
 
   - The sense wire SEM checks are now complete and the wire sample reports
 
   - The sense wire SEM checks are now complete and the wire sample reports
     have been posted on the FDC [http://www.jlab.org/Hall-D/detector/fdc/reports/ Reports Page].  
+
     have been posted on the FDC [http://www.jlab.org/Hall-D/detector/fdc/new_reports/ Wire sample reports].  
  
 
   - The original document for the [http://www.jlab.org/Hall-D/detector/fdc/design/phase3_work.pdf Phase 3 Preparation Work] will be reviewed  
 
   - The original document for the [http://www.jlab.org/Hall-D/detector/fdc/design/phase3_work.pdf Phase 3 Preparation Work] will be reviewed  

Revision as of 18:18, 17 March 2010

March 18, 2010 FDC meeting

Tentative Agenda

  1. FDC production
    • production space update
    • FDC procurement plans
  2. Full scale prototype tests
    • prototype test updates
    • HV tests
    • frame modification work: cathode sandwich and wire frame
    • plans for layer 3
  3. Wire frame update
  4. Cathode frame redesign
    • cathode redesign status
    • rigid-flex assembly
  5. Wire winding
    • IUCF phase 3 contract
    • plans for wire winding upgrades
    • tension specs
  6. Other
    • FDC naming convention
    • ...