Difference between revisions of "Minutes-3-17-2011"

From GlueXWiki
Jump to: navigation, search
 
Line 5: Line 5:
 
# Production
 
# Production
 
#* Production status (David)
 
#* Production status (David)
#* Readiness review [http://www.jlab.org/Hall-D/software/wiki/index.php/FDC_Fabrication_Readiness_Review program] (Lubomir, Dave, Bill)
+
#* [http://www.jlab.org/Hall-D/software/wiki/index.php/FDC_Fabrication_Readiness_Review Readiness Review] (Lubomir, Dave, Bill)
 
# Electronics (Fernando,Chris)
 
# Electronics (Fernando,Chris)
 
#* fADC125
 
#* fADC125

Revision as of 11:21, 17 March 2011

March 17, 2011 FDC meeting

Agenda

  1. Production
  2. Electronics (Fernando,Chris)
    • fADC125
    • Other
  3. Engineering (Bill, David)
    • Conductive tape soldering
    • Other
  4. Chamber testing
    • "Upside-down" tests (Lubomir)
    • Testing set-up improvements (Beni)
  5. Other