Difference between revisions of "Minutes-3-14-2013"

From GlueXWiki
Jump to: navigation, search
m
Line 7: Line 7:
 
# Installation [http://www.jlab.org/Hall-D/detector/fdc/procedures/FDC_install.jpg schedule (last week)],  [http://www.jlab.org/Hall-D/detector/fdc/procedures/FDC_install3.jpg schedule (this week)](Lubomir)
 
# Installation [http://www.jlab.org/Hall-D/detector/fdc/procedures/FDC_install.jpg schedule (last week)],  [http://www.jlab.org/Hall-D/detector/fdc/procedures/FDC_install3.jpg schedule (this week)](Lubomir)
 
# Engineering (Bill)
 
# Engineering (Bill)
#* Manifold installation [http://www.jlab.org/Hall-D/detector/fdc/photographs/IMG_0333.JPG first pair isntalled]
+
#* Manifold installation [http://www.jlab.org/Hall-D/detector/fdc/photographs/IMG_0299.jpg]
 
# Electronics (Chris, Nick)
 
# Electronics (Chris, Nick)
 
# Tests at EEL126 [https://halldweb1.jlab.org/elog-halld/FDC FDC E-log] (Beni)
 
# Tests at EEL126 [https://halldweb1.jlab.org/elog-halld/FDC FDC E-log] (Beni)

Revision as of 17:49, 14 March 2013

March 14, 2013 FDC meeting

Agenda

  1. Production Construction Tracking (Dave)
  2. Installation schedule (last week), schedule (this week)(Lubomir)
  3. Engineering (Bill)
    • Manifold installation [2]
  4. Electronics (Chris, Nick)
  5. Tests at EEL126 FDC E-log (Beni)
  6. Other