Difference between revisions of "Minutes-3-12-2015"

From GlueXWiki
Jump to: navigation, search
Line 26: Line 26:
 
== Gas issues ==
 
== Gas issues ==
  
- CO2 was monitored for another 5 days: first connected to the CDC for one day
+
- CO2 was monitored for another 4 days: first the sensor was connected to the CDC for one day(Thursday-Friday), then moved to EEl126. There
  
 
== CDC update ==
 
== CDC update ==

Revision as of 16:22, 12 March 2015

March 12, 2015 FDC+CDC meeting

Connection

  1. Instructions for Bluejeans meeting connection
  2. FDC meeting ID: 290664653
  3. To join via a Web Browser, go to the page [1] https://bluejeans.com/290664653.

Agenda

  1. Gas issues
    • CO2 monitoring [2],[3]
    • FDC gain measurements
  2. CDC update (Mike)
  3. FDC update [4], [5] (Lubomir)
  4. Electronics (Fernando, Cody, Chris, Nick)
  5. Engineering (Dave)
  6. Other