Difference between revisions of "Minutes-2-9-2012"

From GlueXWiki
Jump to: navigation, search
Line 6: Line 6:
 
#* Third package status
 
#* Third package status
 
#* Electroplating results
 
#* Electroplating results
# First package testing [https://halldweb1.jlab.org/elog-halld/FDC/] (Beni, Lubomir)
+
# First package testing [https://halldweb1.jlab.org/elog-halld/FDC/ FDC ELOG] (Beni, Lubomir)
 
# Engineering update (Bill)  
 
# Engineering update (Bill)  
 
# Electronics update (Chris)
 
# Electronics update (Chris)

Revision as of 19:30, 8 February 2012

February 9, 2012 FDC meeting

Agenda

  1. Production update Construction Tracking (Dave)
    • Third package status
    • Electroplating results
  2. First package testing FDC ELOG (Beni, Lubomir)
  3. Engineering update (Bill)
  4. Electronics update (Chris)
  5. Other