Difference between revisions of "Minutes-2-7-2013"
From GlueXWiki
Line 4: | Line 4: | ||
# Production [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Construction_February_7_2013.xlsx Construction Tracking] (Dave) | # Production [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Construction_February_7_2013.xlsx Construction Tracking] (Dave) | ||
#* Package #2 testing (Lubomir) | #* Package #2 testing (Lubomir) | ||
− | # Basis of Estimate for the FDC [http://www.jlab.org/Hall-D/detector/fdc/budget/ | + | # Basis of Estimate for the FDC [http://www.jlab.org/Hall-D/detector/fdc/budget/BOE_FDC_020713.xls activities] (Lubomir, Bill, Dave) |
# Corrosion tests at MePhi [http://www.jlab.org/Hall-D/detector/fdc/corrosion/mephi_results1.xlsx latest results] (Lubomir) | # Corrosion tests at MePhi [http://www.jlab.org/Hall-D/detector/fdc/corrosion/mephi_results1.xlsx latest results] (Lubomir) | ||
# Engineering (Bill) | # Engineering (Bill) |
Revision as of 12:25, 7 February 2013
February 7, 2013 FDC meeting
Agenda
- Production Construction Tracking (Dave)
- Package #2 testing (Lubomir)
- Basis of Estimate for the FDC activities (Lubomir, Bill, Dave)
- Corrosion tests at MePhi latest results (Lubomir)
- Engineering (Bill)
- Electronics (Nick)
- Tests at EEL126 FDC E-log (Beni)
- Other