Difference between revisions of "Minutes-2-28-2013"

From GlueXWiki
Jump to: navigation, search
Line 4: Line 4:
 
# Production [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Construction_February_28_2013.xlsx Construction Tracking] (Dave)
 
# Production [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Construction_February_28_2013.xlsx Construction Tracking] (Dave)
 
#* Spare parts
 
#* Spare parts
#* Spare wire planes testing
+
#* Spare wire plane testing
 
#* Package #2 status
 
#* Package #2 status
 
# Rebaselining update [http://www.jlab.org/Hall-D/halld_secure/rebaseline/iter_5.html#9-130M ](Lubomir)
 
# Rebaselining update [http://www.jlab.org/Hall-D/halld_secure/rebaseline/iter_5.html#9-130M ](Lubomir)

Revision as of 18:34, 27 February 2013

February 28, 2013 FDC meeting

Agenda

  1. Production Construction Tracking (Dave)
    • Spare parts
    • Spare wire plane testing
    • Package #2 status
  2. Rebaselining update [1](Lubomir)
  3. Engineering (Bill)
    • Cooling system test
  4. Electronics (Chris, Nick)
  5. Tests at EEL126 FDC E-log (Beni)
  6. Other