Difference between revisions of "Minutes-2-28-2013"

From GlueXWiki
Jump to: navigation, search
(Created page with "February 28, 2013 FDC meeting = Agenda = # Production [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Construction_February_28_2013.xlsx Construction Tracking] (Dave) # ...")
 
Line 3: Line 3:
 
= Agenda =
 
= Agenda =
 
# Production [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Construction_February_28_2013.xlsx Construction Tracking] (Dave)
 
# Production [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Construction_February_28_2013.xlsx Construction Tracking] (Dave)
 +
#* Spare parts
 +
#* Spare wire planes testing
 +
#* Package #2 status
 
# Rebaselining update [http://www.jlab.org/Hall-D/halld_secure/rebaseline/iter_5.html#9-130M ](Lubomir)
 
# Rebaselining update [http://www.jlab.org/Hall-D/halld_secure/rebaseline/iter_5.html#9-130M ](Lubomir)
 
# Engineering (Bill)
 
# Engineering (Bill)
 +
#* Cooling system test
 
# Electronics (Chris, Nick)
 
# Electronics (Chris, Nick)
 
# Tests at EEL126 [https://halldweb1.jlab.org/elog-halld/FDC FDC E-log] (Beni)
 
# Tests at EEL126 [https://halldweb1.jlab.org/elog-halld/FDC FDC E-log] (Beni)

Revision as of 18:34, 27 February 2013

February 28, 2013 FDC meeting

Agenda

  1. Production Construction Tracking (Dave)
    • Spare parts
    • Spare wire planes testing
    • Package #2 status
  2. Rebaselining update [1](Lubomir)
  3. Engineering (Bill)
    • Cooling system test
  4. Electronics (Chris, Nick)
  5. Tests at EEL126 FDC E-log (Beni)
  6. Other