Difference between revisions of "Minutes-2-28-2013"
From GlueXWiki
(Created page with "February 28, 2013 FDC meeting = Agenda = # Production [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Construction_February_28_2013.xlsx Construction Tracking] (Dave) # ...") |
|||
Line 3: | Line 3: | ||
= Agenda = | = Agenda = | ||
# Production [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Construction_February_28_2013.xlsx Construction Tracking] (Dave) | # Production [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Construction_February_28_2013.xlsx Construction Tracking] (Dave) | ||
+ | #* Spare parts | ||
+ | #* Spare wire planes testing | ||
+ | #* Package #2 status | ||
# Rebaselining update [http://www.jlab.org/Hall-D/halld_secure/rebaseline/iter_5.html#9-130M ](Lubomir) | # Rebaselining update [http://www.jlab.org/Hall-D/halld_secure/rebaseline/iter_5.html#9-130M ](Lubomir) | ||
# Engineering (Bill) | # Engineering (Bill) | ||
+ | #* Cooling system test | ||
# Electronics (Chris, Nick) | # Electronics (Chris, Nick) | ||
# Tests at EEL126 [https://halldweb1.jlab.org/elog-halld/FDC FDC E-log] (Beni) | # Tests at EEL126 [https://halldweb1.jlab.org/elog-halld/FDC FDC E-log] (Beni) |
Revision as of 18:34, 27 February 2013
February 28, 2013 FDC meeting
Agenda
- Production Construction Tracking (Dave)
- Spare parts
- Spare wire planes testing
- Package #2 status
- Rebaselining update [1](Lubomir)
- Engineering (Bill)
- Cooling system test
- Electronics (Chris, Nick)
- Tests at EEL126 FDC E-log (Beni)
- Other