Line 14: | Line 14: | ||
= Minutes = | = Minutes = | ||
− | Participants: Eugene | + | Participants: Eugene, Bill, Dave, Nick, Chris, Simon, Beni, and Lubomir. |
== Installation == | == Installation == | ||
− | - | + | - A cable holder frame has been installed at the top on face of the magnet (picture attached). It's too far from the mesh and the cables will sag (Nick), but better than before. We may need such frames also on the sides. Tom is working on the cable cradle |
- Before the insertion, the cooling system failed again, the reasons are unknown so far, but there was no LV at this time. During the insertion the Fluorinert houses were disconnected and taped with duck tape at the chiller side (due to the lack of proper caps), as a result we lost >1 gal of Fluorinert: need proper caps for the final insertion! | - Before the insertion, the cooling system failed again, the reasons are unknown so far, but there was no LV at this time. During the insertion the Fluorinert houses were disconnected and taped with duck tape at the chiller side (due to the lack of proper caps), as a result we lost >1 gal of Fluorinert: need proper caps for the final insertion! |
Revision as of 18:18, 27 February 2014
February 27, 2014 FDC meeting
Agenda
- Installation status [1]
- Engineering (Bill, Dave)
- Cathode scan
- LV fast shutdown
- Electronics problematic channels (Fernando, Chris, Nick)
- Mini-DAQ status FDC E-log (Beni)
- Other