Minutes-2-24-2011

From GlueXWiki
Revision as of 19:13, 24 February 2011 by Pentchev (Talk | contribs)

Jump to: navigation, search

February 24, 2011 FDC meeting

Agenda

  1. Production (David)
    • Blue Crab status
    • Readiness review
  2. Electronics (Fernando, Roger)
  3. Engineering (Bill, David, Lubomir)
  4. Chamber testing
    • Tests with the middle chamber (Lubomir)
  5. Other

Minutes

Participants: Eugene, Bill, Dave, Roger, Simon, Beni, and Lubomir.

Production

- Dave: everything moved to Blue Crab (stringing table was moved there right after the meeting). We have there office with computers connected to network. Preparing for the PCB gluing. There was a problem with the lights there again. Bill regarding the stringing table: the pin rail was modified at the machine shop, ready together with the other parts to be mounted on the table at Blue Crab.

- We will have a readiness review in a month from now. Dave and Bill will work on the procedures/travelers/QA documents that are needed for the review. Beni will set up a page with the agenda, similar to that for the CDC review, where we will link all the documents. According to Eugene the review will be more technical than administrative.