Participants: Bill, Mark, Dave, Chris, Simon, Beni, and Lubomir.
+
Participants: Eugene, Bill, Dave, Roger, Simon, Beni, and Lubomir.
  
 
== Production ==
 
== Production ==
  
- Dave: the stringing table and the cathode tensioning system are the only main items not yet moved to Blue Crab. The stringing table will be modified before moving there: 6 holes in the granite have to be drilled and different other new pieces mounted there. Will have three computers in the clean room, one new and another two used, all Windows. The temperature in the clean room is lower than the required one and the vendor will fix the problem tomorrow. It turned out the temperature control is not in the clean room and we are not supposed to use it.  
+
- Dave: everything moved to Blue Crab (stringing table was moved there right after the meeting). We have there office with computers connected to network. Preparing for the PCB gluing. Bill regarding the stringing table: the pin rail was modified at the machine shop, ready together with the other parts to be mounted on the table at Blue Crab.
  
- The plan for the next month work at Blue Crab includes: cathode frame inspection, building PCB rings, cutting, aligning, and gluing cathodes. We will start with old PCB and
+
- We will have a readiness review in a month from now. Dave and Bill will work on the procedures/travelers/QA documents that are needed for the review.
damaged cathode foils and then use the new/good ones. The ultimate plan is to build parts for one chamber that has to be tested before the mass production.  
+
  
- Dave's working on the procedures/travelers, we can't start production without these documents.
+
<!--
 
+
- Bill asked if we need summer students for some work starting end of May.
+
  
 
== Electronics ==
 
== Electronics ==

Revision as of 19:10, 24 February 2011

February 24, 2011 FDC meeting

Agenda

  1. Production (David)
    • Blue Crab status
    • Readiness review
  2. Electronics (Fernando, Roger)
  3. Engineering (Bill, David, Lubomir)
  4. Chamber testing
    • Tests with the middle chamber (Lubomir)
  5. Other

Minutes

Participants: Eugene, Bill, Dave, Roger, Simon, Beni, and Lubomir.

Production

- Dave: everything moved to Blue Crab (stringing table was moved there right after the meeting). We have there office with computers connected to network. Preparing for the PCB gluing. Bill regarding the stringing table: the pin rail was modified at the machine shop, ready together with the other parts to be mounted on the table at Blue Crab.

- We will have a readiness review in a month from now. Dave and Bill will work on the procedures/travelers/QA documents that are needed for the review.