Minutes-2-2-2012

From GlueXWiki
Revision as of 18:57, 1 February 2012 by Pentchev (Talk | contribs) (Created page with "January 26, 2012 FDC meeting = Agenda = # Production update [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Construction_February_2_2012.xlsx Construction Tracking] (D...")

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

January 26, 2012 FDC meeting

Agenda

  1. Production update Construction Tracking (Dave)
    • Third package status
    • Electroplating results
    • Plans for the second package
  2. First package testing status (Lubomir, Beni)
  3. Engineering update (Bill)
  4. Electronics update (Chris)
  5. Other