= Minutes = | = Minutes = | ||
− | Participants: Bill, Dave, Chris, | + | Participants: Bill, Dave, Beni, Chris, Simon, Mark, Eugene, and Lubomir. |
== Production == | == Production == | ||
− | - Dave: wire | + | - Dave: wire boards #20 and #21 ready waiting just for electroplating. |
- Casey is modifying the frame to install the second package on the rotational brackets (taken from the first package, see discussions later). After the second package is moved the tooling needed for the third package will be installed in the testing room. It includes 14 hubs and three metal pins to be taken from package #2. Package number #2 will remain with three metal pins and plastic rods only. | - Casey is modifying the frame to install the second package on the rotational brackets (taken from the first package, see discussions later). After the second package is moved the tooling needed for the third package will be installed in the testing room. It includes 14 hubs and three metal pins to be taken from package #2. Package number #2 will remain with three metal pins and plastic rods only. |
Revision as of 16:13, 2 February 2012
February 2, 2012 FDC meeting
Agenda
- Production update Construction Tracking (Dave)
- Third package status
- Electroplating results
- Plans for the second package
- First package testing (Lubomir, Beni)
- Engineering update (Bill)
- Cooling system
- Other: HV connector position
- Electronics update (Chris)
- Other: once more naming convention