Difference between revisions of "Minutes-2-2-2012"

From GlueXWiki
Jump to: navigation, search
(Agenda)
Line 8: Line 8:
 
#* Plans for the second package  
 
#* Plans for the second package  
 
# First package testing (Lubomir, Beni)
 
# First package testing (Lubomir, Beni)
# Engineering update (Bill)   
+
# Engineering update (Bill)
 +
#* Cooling system
 +
#* [http://www.jlab.org/Hall-D/detector/fdc/drawings/GAP_TO_CONNECTOR.png HV connector position]  
 
# Electronics update (Chris)
 
# Electronics update (Chris)
 
# Other
 
# Other

Revision as of 19:14, 1 February 2012

January 26, 2012 FDC meeting

Agenda

  1. Production update Construction Tracking (Dave)
    • Third package status
    • Electroplating results
    • Plans for the second package
  2. First package testing (Lubomir, Beni)
  3. Engineering update (Bill)
  4. Electronics update (Chris)
  5. Other