January 26, 2012 FDC meeting
Agenda
- Production update Construction Tracking (Dave)
- Third package status
- Electroplating results
- Plans for the second package
- First package testing (Lubomir, Beni)
- Engineering update (Bill)
- Cooling system
- HV connector position
- Electronics update (Chris)