Difference between revisions of "Minutes-2-14-2013"

From GlueXWiki
Jump to: navigation, search
Line 10: Line 10:
 
# Tests at EEL126 [https://halldweb1.jlab.org/elog-halld/FDC FDC E-log] (Beni)
 
# Tests at EEL126 [https://halldweb1.jlab.org/elog-halld/FDC FDC E-log] (Beni)
 
# Other
 
# Other
 
<!--
 
  
 
= Minutes =
 
= Minutes =
Line 36: Line 34:
 
- Bill went step by step over the procedure (linked above) for bending/cutting the cooling tubes and installing the manifolds.
 
- Bill went step by step over the procedure (linked above) for bending/cutting the cooling tubes and installing the manifolds.
  
- 208V in 126 for the chiller will cost us $4.5k. At the same time Beni mentioned that there's 208V already there and he's using it for one of the crates. He may need it also for another two crates when he load them fully with electronics. Beni will check how much current is needed for that. Bill will check also what is the current needed for the chiller (it has breaker at 20A). Eugene insisted to discuss with
+
- 208V in 126 for the chiller will cost us $4.5k. At the same time Beni mentioned that there's 208V already there and he's using it for one of the crates. He may need it also for another two crates when he load them fully with electronics. Beni will check how much current is needed for that. Bill will check also what is the current needed for the chiller (it has breaker at 20A). Eugene insisted to consult also with Giles about the codes, if we can do it temporary by ourself.
 
+
 
 
== Tests at EEL126 ==
 
== Tests at EEL126 ==
  
- On Tuesday we moved the fourth package from EEL to Blue Crab, took the strong-back and hubs, installed them the first package that we transported to EEL for testing. The gas is OK and after the meeting HV was set on all the package successfully.
+
-
  
 
== Other ==
 
== Other ==
  
- Dave is setting a place at the ARC building to work on the gas system control using the Brooks flow controllers.
+
- No meeting next week due to the collaboration meeting.
 
+
-->
+

Revision as of 18:24, 15 February 2013

February 14, 2013 FDC meeting

Agenda

  1. Production Construction Tracking (Dave)
  2. Basis of Estimate for the FDC activities (Lubomir, Bill, Dave)
  3. Corrosion tests at MePhi latest results (Lubomir)
  4. Engineering (Bill)
  5. Electronics (Chris, Nick)
  6. Tests at EEL126 FDC E-log (Beni)
  7. Other

Minutes

Participants: Eugene, Bill, Dave, Chris, Nick, Simon, Beni, and Lubomir.

Production

- Dave for the spare parts: wire frame #3 (old) was tested without HV caps (580/-50nA at 2100/-500V) and now Anatoly is soldering them. Last wire frame (#32) was strung by Casey and Dave, Casey is gluing the wires now, tomorrow will come soldering and tension measurements. Don't need to convert type-2 to type-1 cathode frame (mill the O-ring groove) we have enough; the one that was deformed was used and looks OK. No need for extra spacer rings, the ones on the full-scale prototype can be used (Bill). Tina will come over the weekend to work on the last cathodes. Expect to finish with the spare part production in March.

- Lubomir for package #2: completely tested, oxygen went down to 170ppm. Started installing the grounding, 75% done. It is now on the mounting table and we don't have extra strong-back (used in 126) to put it on a table, or we can't use the holding brackets to hang it on the rails. The holding brackets will be used to test the deformation of the installation cart. So, next week we will move it on a granite table so that we can start working on spare package.

Basis of Estimate for the FDC

- New version of the BOE is linked above. Most of the discussions were after the meeting with Eugene and on the next day.

Corrosion test at MePhi

- Already 18 days Viton and Viton+Apiezon samples are OK. Vlad mentioned that due to the condensation there is some water also directly in the cup with the samples, so the conditions are even more severe.

Engineering

- Bill went step by step over the procedure (linked above) for bending/cutting the cooling tubes and installing the manifolds.

- 208V in 126 for the chiller will cost us $4.5k. At the same time Beni mentioned that there's 208V already there and he's using it for one of the crates. He may need it also for another two crates when he load them fully with electronics. Beni will check how much current is needed for that. Bill will check also what is the current needed for the chiller (it has breaker at 20A). Eugene insisted to consult also with Giles about the codes, if we can do it temporary by ourself.

Tests at EEL126

-

Other

- No meeting next week due to the collaboration meeting.