Difference between revisions of "Minutes-2-12-2015"

From GlueXWiki
Jump to: navigation, search
Line 28: Line 28:
 
== Gas issues ==
 
== Gas issues ==
  
- We had long discussions what to do with the CDC leakage. Everybody agrees that CDC can't be operated like this and the leak has to be fixed. Different proposals: start removing the HVB cards and check with the sniffer the holes at the cheese plate (Beni, Nick, Fernando), check for the leak at the downstream
+
- We had long discussions what to do with the CDC leakage. Everybody agrees that CDC can't be operated like this and the leak has to be fixed. Different proposals: start removing the HVB cards and check with the sniffer the holes at the cheese plate (Beni, Nick, Fernando), check for leaks at the downstream mylar window with a tube on the sniffer (Dave),
  
 
== CDC update ==
 
== CDC update ==

Revision as of 17:09, 13 February 2015

February 12, 2015 FDC+CDC meeting

Connection

  1. Instructions for Bluejeans meeting connection
  2. FDC meeting ID: 290664653
  3. To join via a Web Browser, go to the page [1] https://bluejeans.com/290664653.

Agenda

  1. Gas issues
  2. Electronics (Fernando, Cody)
  3. Engineering (Dave)
  4. CDC update Resolution Vs. Drift time 1200A(Mike)
  5. FDC update (Lubomir)
  6. Other