Minutes-2-10-2011
From GlueXWiki
February 10, 2011 FDC meeting
Agenda
- Production (David)
- Blue Crab status
- Electronics (Fernando, Chris, Roger)
- Rigid-flex assemblies
- Foil production status
- Other
- Engineering (Bill, David, Lubomir)
- Wire stringing
- Test wire plane
- Other
- Full-scale prototype studies
- Further tests of top/bottom cathode signals FDC Log Book, page 552 (Lubomir)
- Other