Difference between revisions of "Minutes-2-10-2011"

From GlueXWiki
Jump to: navigation, search
 
(Agenda)
Line 13: Line 13:
 
#* Test wire plane
 
#* Test wire plane
 
#* Other
 
#* Other
# Full-scale prototype studies
+
# Full-scale prototype studies (Lubomir)
#* Further tests of top/bottom cathode signals [http://www.jlab.org/Hall-D/detector/fdclog/ FDC Log Book, page 552] (Lubomir)
+
#* Further tests of top/bottom cathode signals [http://www.jlab.org/Hall-D/detector/fdclog/ FDC Log Book, page 552]
 
# Other
 
# Other
  

Revision as of 12:32, 10 February 2011

February 10, 2011 FDC meeting

Agenda

  1. Production (David)
    • Blue Crab status
  2. Electronics (Fernando, Chris, Roger)
    • Rigid-flex assemblies
    • Foil production status
    • Other
  3. Engineering (Bill, David, Lubomir)
    • Wire stringing
    • Test wire plane
    • Other
  4. Full-scale prototype studies (Lubomir)
  5. Other