Minutes-11-8-2012
From GlueXWiki
November 8, 2012 FDC meeting
Agenda
- Production Construction Tracking (Dave)
- First package testing (Vlad)
- Corrosion tests, corroded solder on Viton sample (Vlad)
- Engineering (Bill)
- Bubbler issue and pressure control [1]
- Electronics (Chris, Nick)
- Third package tests FDC E-log (Beni, Simon)
- Moving to Blue Crab?
- Other