November 8, 2012 FDC meeting

Agenda

  1. Production Construction Tracking (Dave)
    • First package testing (Vlad)
  2. Corrosion tests, corroded solder on Viton sample (Vlad)
  3. Engineering (Bill)
    • Bubbler issue and pressure control [1]
  4. Electronics (Chris, Nick)
  5. Third package tests FDC E-log (Beni, Simon)
    • Moving to Blue Crab?
  6. Other


Minutes

Participants: Bill, Dave, Chris, Nick, Vlad, Simon, Beni, and Lubomir.

Production

- Casey and Tina strung wire frame #30 on Saturday. Dave put the Kapton dots and did position measurements. Casey will come again this Saturday to glue the wires. Anatoly is preparing the old cathode frames for package #2 and will finish soon.

- Vlad is testing package #1. Currents on cell #4 300nA, #3 350nA, #2 170nA, #1 (just started) 500nA. For comparison 3 weeks ago we had 900nA on cell #4. All the channels so far are working fine. Vlad found two pre-amps oscillating.

Cathode corrosion test

- The testing chamber was opened.