Difference between revisions of "Minutes-11-8-2012"
From GlueXWiki
(Created page with "November 8, 2012 FDC meeting = Agenda = # Production [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Construction_November_8_2012.xlsx Construction Tracking] (Dave) #* P...") |
|||
Line 3: | Line 3: | ||
= Agenda = | = Agenda = | ||
# Production [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Construction_November_8_2012.xlsx Construction Tracking] (Dave) | # Production [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Construction_November_8_2012.xlsx Construction Tracking] (Dave) | ||
− | #* | + | #* First package testing (Vlad) |
# Corrosion [http://www.jlab.org/Hall-D/detector/fdc/corrosion/Spreadsheet.pdf tests] (Vlad) | # Corrosion [http://www.jlab.org/Hall-D/detector/fdc/corrosion/Spreadsheet.pdf tests] (Vlad) | ||
# Engineering (Bill) | # Engineering (Bill) | ||
− | #* | + | #* Bubbler issue and pressure control [http://www.omnicontrols.com/images/PDF/A3000_cat.pdf] |
# Electronics (Chris, Nick) | # Electronics (Chris, Nick) | ||
# Third package tests [https://halldweb1.jlab.org/elog-halld/FDC FDC E-log] (Beni, Simon) | # Third package tests [https://halldweb1.jlab.org/elog-halld/FDC FDC E-log] (Beni, Simon) |
Revision as of 19:14, 7 November 2012
November 8, 2012 FDC meeting
Agenda
- Production Construction Tracking (Dave)
- First package testing (Vlad)
- Corrosion tests (Vlad)
- Engineering (Bill)
- Bubbler issue and pressure control [1]
- Electronics (Chris, Nick)
- Third package tests FDC E-log (Beni, Simon)
- Moving to Blue Crab?
- Other