Difference between revisions of "Minutes-11-17-2011"
From GlueXWiki
Line 7: | Line 7: | ||
#* Second package tests (Lubomir) | #* Second package tests (Lubomir) | ||
# Engineering update (Bill) | # Engineering update (Bill) | ||
− | # Electronics update (Chris) | + | # Electronics update (Chris) |
+ | #* http://www.jlab.org/Hall-D/detector/fdc/drawings/FDC_PREAMP_LOCATIONS.xlsx LV cabling] | ||
# [http://www.jlab.org/Hall-D/detector/fdc/tdr/tdr.pdf TDR] (Lubomir) | # [http://www.jlab.org/Hall-D/detector/fdc/tdr/tdr.pdf TDR] (Lubomir) | ||
# Other | # Other |
Revision as of 19:31, 16 November 2011
November 17, 2011 FDC meeting
Agenda
- Production Construction Tracking (Dave)
- Production update
- Second package tests (Lubomir)
- Engineering update (Bill)
- Electronics update (Chris)
- TDR (Lubomir)
- Other