Difference between revisions of "Minutes-11-17-2011"
From GlueXWiki
(Created page with "November 17, 2011 FDC meeting = Agenda = # Production [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Construction_November_10_2011.xlsx Construction Tracking] (Dave) #...") |
|||
Line 3: | Line 3: | ||
= Agenda = | = Agenda = | ||
− | # Production [http://www.jlab.org/Hall-D/detector/fdc/production/ | + | # Production [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Construction_November_17_2011.xlsx Construction Tracking] (Dave) |
#* Production update | #* Production update | ||
#* Second package tests (Lubomir) | #* Second package tests (Lubomir) | ||
− | # Engineering update | + | # Engineering update (Bill) |
# Electronics update (Chris); [http://www.jlab.org/Hall-D/detector/fdc/drawings/FDC_PREAMP_LOCATIONS.xlsx Fernado's LV scheme] | # Electronics update (Chris); [http://www.jlab.org/Hall-D/detector/fdc/drawings/FDC_PREAMP_LOCATIONS.xlsx Fernado's LV scheme] | ||
− | |||
# [http://www.jlab.org/Hall-D/detector/fdc/tdr/tdr.pdf TDR] (Lubomir) | # [http://www.jlab.org/Hall-D/detector/fdc/tdr/tdr.pdf TDR] (Lubomir) | ||
− | # Other | + | # Other |
<!-- | <!-- |
Revision as of 19:30, 16 November 2011
November 17, 2011 FDC meeting
Agenda
- Production Construction Tracking (Dave)
- Production update
- Second package tests (Lubomir)
- Engineering update (Bill)
- Electronics update (Chris); Fernado's LV scheme
- TDR (Lubomir)
- Other