Difference between revisions of "Minutes-11-12-2015"

From GlueXWiki
Jump to: navigation, search
Line 25: Line 25:
 
== CDC update ==
 
== CDC update ==
  
- Mike showed presentation (attached) about precise fitting of the time-to-distance in presence of tube deformation. The 3D plots show the average drift distance (from track fitting) as function of drift time and wire offset from the center.   
+
- Mike showed presentation (attached) about precise fitting of the time-to-distance in presence of tube deformation. The 3D plots show the average drift distance (from track fitting) as function of drift time and wire offset from the center. The Garfield results don't describe the data very well, but using the same functional form they were fitted to the data. The time-to-distance relation obtained in this way turned out to be different for different runs (not clear why). As a result of this procedure the resolution looks very good (last slide).   
 +
Once Mike has the correct relation he plans to run the alignment procedure once more.
  
- Naomi asked how to prepare the CDC configuration file for the new firmware. Beni: it's up to Sasha, but in the mean time she can send the configuration parameters to Sergey to be hard coded.
+
- Plan to run DAQ with both CDC and FDC over the weekend. Cody made some fixes in the firmware.  
  
 
== FDC update ==
 
== FDC update ==
  
- There's an improvement in the Cathode X-resolution (cathode reconstructed  - nominal wire position). See plot above - blue is old result, red is the new one; the two distributions have the same normalization. This is a result of systematic corrections vs distance to the middle of the strip (as discussed in the Collaboration meeting) and some additional channel calibrations.  
+
- On Wednesday the spare package has been moved to the Hall (picture). Signal and LV cables have been connected. We will use the right side of the ST crate - the setting of the TI needs to be changed. HV connections and grounding will be done soon. Curtis mentioned the need to protect the package at the downstream side - after the meeting aluminum cover was installed there.  
 
+
- Simon and Lubomir are working on implementing Lubomir's code for the 3d-point reconstruction into the Simon's tracking. First we will compare the tracking results of the two codes using straight tracks.
+
 
+
- Today at the run coordination meeting we decided to move the spare FDC package to the Hall on Monday, but it will be postponed. We need to install 3 fADC125 units in some crate and we discussed the options - most likely in the start counter crate. We need one additional HV module to be installed somewhere, and 4 extra LV channels. This will be decided with Fernando, Nick next week.  
+
  
 
== Electronics ==
 
== Electronics ==
 
- Fernando looked with a scope on the CDC and FDC pre-amp response function using a pulser. There's no difference between the two - so the tails must come from the detector. More detailed studies will be done in the tagger where we have a DAQ working, so we will include the fADCs into the chain. Nick and Lubomir will work on this tomorrow.
 
 
- Cody uploaded the latest firmware into the CDC crates. He corrected a problem found by Naomi in case of multiple peak processing. Cody also implemented busy signal as trigger hold-off, but it requires update of the TI firmware. If this doesn't work, a fixed 5 msec hold-off can be used.  All the detectors must be ready for the run in three weeks from now (as decided on the run coordination meeting today) and this includes the new firmware.
 
 
== Engineering ==
 
 
- Dave: the NBX serial issue is still there, but not visible now after a temporary fix.
 
 
== Other ==
 
 
- Beni brought the subject of instrumentation papers, one for each CDC and FDC. Fernando: is it worth writing separate paper on the electronics? Most likely it is, since the only "publication" so far is a poster at the IAAA conference by Gerard years ago.
 
 
-->
 

Revision as of 18:19, 12 November 2015

November 12, 2015 Drift Chamber meeting

Connection

  1. Instructions for Bluejeans meeting connection
  2. Meeting ID: 290664653
  3. To join via a Web Browser, go to the page [1] https://bluejeans.com/290664653.

Agenda

  1. CDC update (Mike, Simon)
  2. FDC update (Lubomir, Luke)
  3. Electronics (Fernando, Chris, Nick)
  4. Engineering (Dave)
  5. Other

Minutes

Participants: Curtis, Naomi, Mike (CMU), Sean (NU), Fernando, Cody, Luke, Dave, Chris, Nick, Simon, Beni, and Lubomir (JLab).

CDC update

- Mike showed presentation (attached) about precise fitting of the time-to-distance in presence of tube deformation. The 3D plots show the average drift distance (from track fitting) as function of drift time and wire offset from the center. The Garfield results don't describe the data very well, but using the same functional form they were fitted to the data. The time-to-distance relation obtained in this way turned out to be different for different runs (not clear why). As a result of this procedure the resolution looks very good (last slide). Once Mike has the correct relation he plans to run the alignment procedure once more.

- Plan to run DAQ with both CDC and FDC over the weekend. Cody made some fixes in the firmware.

FDC update

- On Wednesday the spare package has been moved to the Hall (picture). Signal and LV cables have been connected. We will use the right side of the ST crate - the setting of the TI needs to be changed. HV connections and grounding will be done soon. Curtis mentioned the need to protect the package at the downstream side - after the meeting aluminum cover was installed there.

Electronics