Difference between revisions of "Minutes-11-11-2010"
From GlueXWiki
(→Tentative Agenda) |
|||
Line 17: | Line 17: | ||
# Full-scale prototype tests | # Full-scale prototype tests | ||
#* timing with fADC125 (Beni) | #* timing with fADC125 (Beni) | ||
− | #* cathode resolution studies (Simon and Lubomir)[http://www.jlab.org/Hall-D/detector/fdclog/ FDC Log Book, pages 537-538] | + | #* cathode resolution studies (Simon and Lubomir) [http://www.jlab.org/Hall-D/detector/fdclog/ FDC Log Book, pages 537-538] |
# Other | # Other | ||
Revision as of 18:18, 10 November 2010
November 11, 2010 FDC meeting
Tentative Agenda
- Production (David)
- Blue Crab status sketch
- Frame lamination
- Production plan
- Electronics (Fernando, Chris, Roger)
- Update on PCB inspection
- Other
- Cathode foil production
- Rigid-flex procurement
- Engineering (Bill, David, Beni)
- Wire stringing status; stepper motor controller.
- Other
- Full-scale prototype tests
- timing with fADC125 (Beni)
- cathode resolution studies (Simon and Lubomir) FDC Log Book, pages 537-538
- Other