#* Rigid-flex procurement
 
#* Rigid-flex procurement
 
# Engineering (Bill, David, Beni)
 
# Engineering (Bill, David, Beni)
#* Wire stringing status; stepper motor controller.  
+
#* Wire stringing status [http://www.jlab.org/Hall-D/detector/fdc/WireStringing/winding_table.docx model] ; stepper motor controller.  
 
#* Other
 
#* Other
 
# Full-scale prototype tests
 
# Full-scale prototype tests
 
#* timing with fADC125 (Beni)
 
#* timing with fADC125 (Beni)
#* cathode resolution studies (Simon and Lubomir) [http://www.jlab.org/Hall-D/detector/fdclog/ FDC Log Book, pages 537-538]
+
#* cathode resolution studies (Simon and Lubomir) [http://www.jlab.org/Hall-D/detector/fdclog/ FDC Log Book, pages 537-539]
 
# Other
 
# Other
  
<!--
+
 
  
 
= Minutes =
 
= Minutes =
Participants: Eugene, Bill, Glenn, Simon, Chris, Roger, David, Beni, and Lubomir.
+
Participants: Eugene, Fernando, Bill, Casey, Mark, Chris, Roger, Al, Simon, Beni, and Lubomir.
  
 
== Production ==
 
== Production ==
  
- The company will start bringing materials for the clean room on Nov 24. The AC for the whole area will be installed by Dec 7. Before that for the lamination we will use mostly the office (low humidity <40%), and the granite tables outside for vacuum bagging if the humidity is low. That was not the case today.
+
- They are going to install phones and work on the Internet today at Blue Crab. We can now use heaters at low temperatures; must be above 60degF for gluing.  
  
- We got all the wire frames (32) and spacer rings (30). 17 wire frames laminated; 14 are back at Vision machine for fly cut.  
+
- By next Wednesday expect to have all the wire frames laminated. 18 frames came back from Vision machine after fly cut. They started there also the cathode frame production.
 +
 
 +
- Dave made the next version of the production plan. We start production in March 2011, the first package will be ready by September 2011 and then every ~4 months we plan to have a new package. According to the plan we will produce chamber by chamber serially, so that we can test them at the same time.  
  
 
== Electronics ==
 
== Electronics ==
  
- Chris: by Wednesday we will have all the PCBs populated. The company sent two pictures (link above) showing delaminations on two of the boards. They claim the delamination was there when the boards arrived. But Chris would have seen it!? Roger: the heating cycle they use may cause delamination. Chris will ask
+
- Chris received all the populated PCBs. The inspection showed that the packaging was not done correctly (as for the first article) and as a result 8 PCBs (3+3+2 of different types) had broken tips up to 1.5". Bill thinks that this is not crucial and one should be able to glue the PCBs together. The main problem is that the PCBs have much more flux than the first article PCBs; the latter also were not acceptable. Fernando discussed the issue with the company and we will ship all the PCBs back for cleaning. In addition Chris found some other problems that are not crucial (Fernando). Find many pictures from the PCB inspection at  M:\halld-electronics\Documents\FDC\Populated FDC First Articles on Windows, or at the /group/halld-electronics/Documents/FDC/Populated FDC First Articles on linux.
the company for information about this.  
+
  
- Ultrasonic cleaning: according to Chris 6.6gal Vigon costs $285; we need 14gal. Not clear how often we have to change it.
+
- Roger received the Gerber files from Allflex adjusted to the production, for final approval. Bill and Fernando looked at them and agreed. The first cathode foils will be produced in the week of 11/29-12/3. The rigid-flex contract was awarded with a company also near Minneapolis. We will have the first article also by the end of the month.  
  
- Roger: the cathode foil Gerber files will be sent right after the meeting. The extra connectors were included. Will have the first article by Dec 3.
+
- Cathode foil inspection: George Jacob suggested moving the two tables inside the Hall B clean area in the evening before the week of 12/6-12/10, using the roll-up door, so that the particle count goes down by 12/6. We have one 2x5' table and need to find another one. Fernando: need to check the connectivity (resistance if measurable) for each strip, but also between the strips; the latter was an issue before. Fernando will send David the QA procedure for the cathode foils and the PCBs.
Roger got two quotations and two "no-bids" for the rigid-flex which is good enough for the submission of the PR tomorrow.  
+
 
   
 
   
- We negotiated with Hall B to use a corner in their clean room for cathode foil inspection for two weeks in total. They need a schedule and a list of the people that will work there. Before that we need to decide what kind of tests we want to do. Beni: measuring connectivity of all the strips is needed for the first article. Eugene: resistivity measurements (2 Ohms per strip) and we may look for variations of the Cu thickness. Glenn: difficult for low resistivity. Roger: we may use camera for inspection. Lubomir will consult also Fernando and other people that have done this before, and will make a plan and list of the people.
 
 
 
== Engineering ==
 
== Engineering ==
  
- Movement system. David: The USB-ISA connection is not trivial and requires significant efforts. Two people from "Cross-Automation" came today to 126 to discuss the interface to the stepper motor. They could provide a controller system for $3-5K that will work for us. Also, they could provide or assist in developing the software but we are not ready with the requirements. Some free software interface exists and Lubomir will look to estimate how easy will be for us to develop the software.
+
- Bill showed his model of the wire stringing table (linked above). He made improvements in the height adjustment of the strongback. The movement system will be attached to the sides of the table and movable over the chamber. There were different suggestions how to install it so that it's not obstructive when stringing. We discussed also how to calibrate/set starting point for the position measurements.
  
- Bill send the strongback back to the machine shop for some modifications. Working on the spool holder and the weights (out of steel). Bill explained how the
+
- Stepper motor controller: Beni tried to use JLab controllers from the target group to control the motor. It works only without using the encoder. Therefore, we will order a new controller from "Cross-Automation" for ~$3k. As for the software, it comes with low level, AcroBasic, and high level, AcrView software. There are drivers also for LabView (Dave) and we will ask for help from somebody in the lab familiar with LabView.  
movement system will be attached to the granite table. This may require drilling additional holes in the granite, but this time horizontally.
+
  
- Wire tensions: Lubomir investigated to effect of the wire offsets on the gain and on the strip signals. As long as the tension is above 15g on the sense wires and above 60g on the field wires, the effects on the chamber operation are small. We can use as nominal tensions: 20g and 132g based on Dan's estimates and Bill's correction of the field wire linear density. However, too high tension on the field wire is not needed (since we can tolerate some difference in the gravitational sag) and may cause frame deformation. Bill will estimate the deformation effects and after that we can decide about the tension values.
+
- Using laser sensor for position measurement: The laser sensor we use for foil tension measurements has low sampling rate (~1kHz) which is not good enough to measure frequenses of the order of several hundred Hz (Fernando). We will try with a free sample 200kHz sensor (Bill) and if it works for us we will buy it.
  
 
== Full-scale prototype tests ==
 
== Full-scale prototype tests ==
  
- Beni connected the trigger logical signal into the fADC to measure the trigger time w.r.t. fADC clock. Most of the time, there's only one sample in between the min and max value of the rising edge. This was not expected, since the shaping time must be ~35ns!? Beni used the events with two samples to estimate the slope which was used for the events with one sample to estimate the trigger time. Using such procedure, the distribution of the trigger time between the samples is very flat and the peaks in the drift time distribution disappear (page 535).
+
- Beni is using now both, fADC and discriminator cards, for timing at different places on the top and middle chamber. He will be able to compare directly their performance, but has some software problems.
  
- Measurements with the bottom chamber showed the vertical positions of the wires  look much better than for the top chamber (page 536). No explanation yet. There's ~0.2mm offset for the bottom, compared to ~1mm for the top chamber. Lubomir did also Garfield simulations (page 534) of the strip signals as a function of the avalanche azimuthal angle around the wire and also for different wire offsets. The angle variations are of the order of few %. 1mm offset of the wire up would give a top/bottom strip ratio of ~1.5 what we actually measure for the top chamber.
+
- Fernando found that one of the connectors for the discriminator card in the middle chamber is noisy. Beni: checking the connectors should be included in the QA procedure.
  
-->
+
- Lubomir studied the cathode resolution as function of the strip multiplicity for different thresholds (page 539) using cosmics data. The strip multiplicity in the Simon's MC simulations (page 537) of ~4.5 corresponds to about 15mV threshold at 2 10^5 gas gain. At 40mV threshold the mean multiplicity goes down to ~3 but the resolution gets worse. The GlueX event size is dominated by the size of the data from the FDC cathodes. Therefore, this is a trade between resolution and event size.

Latest revision as of 20:12, 11 November 2010

November 11, 2010 FDC meeting

Tentative Agenda

  1. Production (David)
    • Blue Crab status sketch
    • Frame lamination
    • Production plan
  2. Electronics (Fernando, Chris, Roger)
    • Update on PCB inspection
    • Other
    • Cathode foil production
    • Rigid-flex procurement
  3. Engineering (Bill, David, Beni)
    • Wire stringing status model ; stepper motor controller.
    • Other
  4. Full-scale prototype tests
  5. Other


Minutes

Participants: Eugene, Fernando, Bill, Casey, Mark, Chris, Roger, Al, Simon, Beni, and Lubomir.

Production

- They are going to install phones and work on the Internet today at Blue Crab. We can now use heaters at low temperatures; must be above 60degF for gluing.

- By next Wednesday expect to have all the wire frames laminated. 18 frames came back from Vision machine after fly cut. They started there also the cathode frame production.

- Dave made the next version of the production plan. We start production in March 2011, the first package will be ready by September 2011 and then every ~4 months we plan to have a new package. According to the plan we will produce chamber by chamber serially, so that we can test them at the same time.

Electronics

- Chris received all the populated PCBs. The inspection showed that the packaging was not done correctly (as for the first article) and as a result 8 PCBs (3+3+2 of different types) had broken tips up to 1.5". Bill thinks that this is not crucial and one should be able to glue the PCBs together. The main problem is that the PCBs have much more flux than the first article PCBs; the latter also were not acceptable. Fernando discussed the issue with the company and we will ship all the PCBs back for cleaning. In addition Chris found some other problems that are not crucial (Fernando). Find many pictures from the PCB inspection at M:\halld-electronics\Documents\FDC\Populated FDC First Articles on Windows, or at the /group/halld-electronics/Documents/FDC/Populated FDC First Articles on linux.

- Roger received the Gerber files from Allflex adjusted to the production, for final approval. Bill and Fernando looked at them and agreed. The first cathode foils will be produced in the week of 11/29-12/3. The rigid-flex contract was awarded with a company also near Minneapolis. We will have the first article also by the end of the month.

- Cathode foil inspection: George Jacob suggested moving the two tables inside the Hall B clean area in the evening before the week of 12/6-12/10, using the roll-up door, so that the particle count goes down by 12/6. We have one 2x5' table and need to find another one. Fernando: need to check the connectivity (resistance if measurable) for each strip, but also between the strips; the latter was an issue before. Fernando will send David the QA procedure for the cathode foils and the PCBs.

Engineering

- Bill showed his model of the wire stringing table (linked above). He made improvements in the height adjustment of the strongback. The movement system will be attached to the sides of the table and movable over the chamber. There were different suggestions how to install it so that it's not obstructive when stringing. We discussed also how to calibrate/set starting point for the position measurements.

- Stepper motor controller: Beni tried to use JLab controllers from the target group to control the motor. It works only without using the encoder. Therefore, we will order a new controller from "Cross-Automation" for ~$3k. As for the software, it comes with low level, AcroBasic, and high level, AcrView software. There are drivers also for LabView (Dave) and we will ask for help from somebody in the lab familiar with LabView.

- Using laser sensor for position measurement: The laser sensor we use for foil tension measurements has low sampling rate (~1kHz) which is not good enough to measure frequenses of the order of several hundred Hz (Fernando). We will try with a free sample 200kHz sensor (Bill) and if it works for us we will buy it.

Full-scale prototype tests

- Beni is using now both, fADC and discriminator cards, for timing at different places on the top and middle chamber. He will be able to compare directly their performance, but has some software problems.

- Fernando found that one of the connectors for the discriminator card in the middle chamber is noisy. Beni: checking the connectors should be included in the QA procedure.

- Lubomir studied the cathode resolution as function of the strip multiplicity for different thresholds (page 539) using cosmics data. The strip multiplicity in the Simon's MC simulations (page 537) of ~4.5 corresponds to about 15mV threshold at 2 10^5 gas gain. At 40mV threshold the mean multiplicity goes down to ~3 but the resolution gets worse. The GlueX event size is dominated by the size of the data from the FDC cathodes. Therefore, this is a trade between resolution and event size.