Difference between revisions of "Minutes-11-11-2010"

From GlueXWiki
Jump to: navigation, search
(Tentative Agenda)
Line 17: Line 17:
 
# Full-scale prototype tests
 
# Full-scale prototype tests
 
#* timing with fADC125 (Beni)
 
#* timing with fADC125 (Beni)
#* cathode resolution studies (Simon and Lubomir)[http://www.jlab.org/Hall-D/detector/fdclog/ FDC Log Book, pages 537-538]
+
#* cathode resolution studies (Simon and Lubomir) [http://www.jlab.org/Hall-D/detector/fdclog/ FDC Log Book, pages 537-538]
 
# Other
 
# Other
  

Revision as of 18:18, 10 November 2010

November 11, 2010 FDC meeting

Tentative Agenda

  1. Production (David)
    • Blue Crab status sketch
    • Frame lamination
    • Production plan
  2. Electronics (Fernando, Chris, Roger)
    • Update on PCB inspection
    • Other
    • Cathode foil production
    • Rigid-flex procurement
  3. Engineering (Bill, David, Beni)
    • Wire stringing status; stepper motor controller.
    • Other
  4. Full-scale prototype tests
  5. Other