Difference between revisions of "Minutes-11-11-2010"
From GlueXWiki
Line 12: | Line 12: | ||
#* Cathode foil production | #* Cathode foil production | ||
#* Rigid-flex procurement | #* Rigid-flex procurement | ||
− | # Engineering (Bill, David) | + | # Engineering (Bill, David, Beni) |
#* Wire stringing status; stepper motor controller. | #* Wire stringing status; stepper motor controller. | ||
#* Other | #* Other |
Revision as of 18:18, 10 November 2010
November 11, 2010 FDC meeting
Tentative Agenda
- Production (David)
- Blue Crab status sketch
- Frame lamination
- Production plan
- Electronics (Fernando, Chris, Roger)
- Update on PCB inspection
- Other
- Cathode foil production
- Rigid-flex procurement
- Engineering (Bill, David, Beni)
- Wire stringing status; stepper motor controller.
- Other
- Full-scale prototype tests
- timing with fADC125 (Beni)
- cathode resolution studies (Simon and Lubomir)FDC Log Book, pages 537-538
- Other